Roofing

Roofing in Monument, CO

Roofing in Monument, CO planned around PPRBD's reroof rules, elevation-based ice barrier, and the Town's new Colorado Wildfire Resiliency Code.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
New charcoal architectural shingle roof on a newer two-story home near the Palmer Divide in Monument, Colorado
New charcoal architectural shingle roof on a newer two-story home near the Palmer Divide in Monument, Colorado — illustrative reference image, not a project photo.
On this page14 sections
  1. 01When a Monument Reroof Needs a PPRBD Permit
  2. 02No Overlays — Full Tear-Off Is Required
  3. 03Ice Barrier Depends on Elevation
  4. 04Pitch, Drip Edge, and Deck Condition
  5. 05Monument’s New Wildfire Code Reaches Roofing
  6. 06Inspections and Material Staging
  7. 07Valleys, Flashing, and Attic Ventilation
  8. 08How We Sequence a Monument Roof
  9. 09Roofing Near Monument
  10. 10Roofing in Other Front Range Cities
  11. 11Other Apollo Services in Monument
  12. 12Related Pages
  13. 13Common Questions
  14. 14Talk to Us About Your Project

A Monument roof isn’t just a Pikes Peak Regional Building Department (PPRBD) project anymore. Since March 2026, the Town of Monument has also adopted a statewide wildfire building code that reaches roofing work, and Monument’s elevation sits close to a threshold that changes what underlayment a reroof needs. Our crew checks both agencies before tear-off starts, not after the permit is already filed.

When a Monument Reroof Needs a PPRBD Permit

PPRBD requires a permit for any reroof or roof repair over 100 square feet, whether the work is done by a licensed contractor or a homeowner. Performing that work without a license is a Code violation unless the person owns the residential property and it is their primary residence.

We measure the actual roof area before assuming a small patch is exempt. A repair that looks minor from the ground can still cross the 100-square-foot line once slopes, valleys, and flashing areas are added up, and starting work before the permit is issued risks a stop-work order.

No Overlays — Full Tear-Off Is Required

PPRBD does not allow a new asphalt roof covering to be installed without first removing all existing layers of roof covering on a residential home. A second layer of shingles over the old ones is not an option in PPRBD’s jurisdiction, Monument included.

That rule shapes our schedule and dumpster planning from day one. Once tear-off starts, the deck is exposed to weather, so removal, deck inspection, and dry-in have to move together rather than getting spread across multiple days.

Ice Barrier Depends on Elevation

Properties above 7,000 feet in elevation require an ice barrier — either two layers of cemented underlayment or a self-adhering polymer-modified bitumen sheet — extending from the eave’s edge to at least 24 inches inside the exterior wall line. PPRBD lists the property’s elevation on the permit receipt.

Monument sits close enough to that 7,000-foot line that we don’t assume either way. We confirm the elevation shown on the permit before ordering underlayment, because guessing wrong means re-ordering material or failing inspection on a detail that’s easy to get right up front.

Pitch, Drip Edge, and Deck Condition

Asphalt shingles cannot be installed on a roof pitch under 2:12, and drip edge is required at eaves and rakes. Where the existing roof has plank decking instead of plywood, any gap wider than ¼ inch has to be re-decked or overlaid before shingles go down.

We check deck condition as soon as tear-off exposes it, not after underlayment is already rolled out. An older Monument home with skip-sheathing decking is a common surprise, and it’s cheaper to plan for it at the estimate stage than to discover it mid-tear-off.

Monument’s New Wildfire Code Reaches Roofing

In March 2026, Monument’s Town Council adopted Ordinance No. 05-2026, readopting the 2021 International Fire Code with local amendments alongside the Colorado Wildfire Resiliency Code (CWRC), effective July 1, 2026. The Town states that Monument contains all three wildland-urban interface classifications, and that the code applies to new construction, significant alterations, and certain repairs in wildfire-prone areas.

The Town’s announcement doesn’t spell out a specific roofing-material list, so we confirm current requirements with the Town or PPRBD before specifying a covering for a reroof that counts as a significant alteration. Treating the old rules as still complete is the kind of assumption that can stall a permit.

Inspections and Material Staging

Typical asphalt roofing and Direct-To-Deck metal shingles don’t require a mid-roof inspection. Tile roofs do — PPRBD requires that inspection after underlayment, battens, and flashing are installed and before tile is stocked or laid. Stocking roofing material on the driveway or roof counts as the start of the project; doing that before the permit is issued can trigger a triple permit fee and a stop-work order.

We schedule material delivery around permit issuance, not the other way around. For tile jobs, we also build the mid-roof inspection request into the timeline so battens and flashing stay visible long enough for PPRBD to review them.

Valleys, Flashing, and Attic Ventilation

Valleys concentrate more water and snowmelt than any other part of a Monument roof, and flashing at valleys, chimneys, skylights, and sidewalls is where most leaks actually start rather than in the field of the shingles themselves. We replace step flashing and counter-flashing rather than reusing bent or rusted pieces from the old roof, since flashing that looks intact from the ground often isn’t once it’s off the roof.

Attic ventilation also affects how a new roof performs through a Front Range winter. A roof deck that can’t breathe traps moisture, which shortens shingle life and can contribute to ice damming at the eaves even where the ice barrier is correctly installed. We check existing intake and exhaust venting during tear-off and flag any imbalance before the new covering goes down, since it’s far easier to correct venting with the deck open than after the roof is finished.

How We Sequence a Monument Roof

The sequence starts with confirming the permit threshold, the elevation shown on the permit, and whether the CWRC applies to the specific scope. Then tear-off exposes the deck for inspection, underlayment and ice barrier go down according to elevation and slope, and flashing is set before covering.

For tile or qualifying metal systems, the mid-roof inspection happens before covering is installed. The final inspection closes the permit once the roof is complete, and we keep the assembly visible at every stage PPRBD needs to see it.

Roofing Near Monument

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Roofing in Other Front Range Cities

Apollo handles roofing across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Monument

These Monument guides cover the other projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Monument.

Common Questions

Does every roof repair in Monument need a PPRBD permit?
Only repairs and reroofs over 100 square feet. Smaller repairs are generally exempt, but we still measure the actual scope before assuming a job qualifies.

Will my Monument roof need ice-barrier underlayment?
It depends on elevation. PPRBD requires an ice barrier above 7,000 feet, and Monument sits close to that line, so we confirm the elevation on the permit receipt before ordering underlayment.

Does Monument’s new wildfire code affect a roof replacement?
It can. The Town adopted the Colorado Wildfire Resiliency Code effective July 1, 2026, covering new construction, significant alterations, and certain repairs in wildfire-prone areas, which include Monument. We confirm current material requirements with the Town before ordering.

Can a new layer of shingles go over my existing roof?
No. PPRBD requires all existing roof covering layers to be removed before a new asphalt roof is installed — overlays are not allowed.

Talk to Us About Your Project

Tell us your roof’s age, material, approximate square footage, and whether you’ve seen leaks, hail damage, or sagging. We’ll confirm the PPRBD permit threshold, the elevation-based underlayment requirement, and whether Monument’s wildfire code applies before we schedule tear-off.