Roofing in Colorado Springs, CO

Roofing in Colorado Springs planned around PPRBD's tear-off rule, Class A coverings, 7,000-ft ice barrier line, and tile dry-in inspection requirements.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
Architectural asphalt shingle roof on a two-story stucco home with Pikes Peak rising in the background
Architectural asphalt shingle roof on a two-story stucco home with Pikes Peak rising in the background — illustrative reference image, not a project photo.
On this page13 sections
  1. 01Full Tear-Off, Not a Second Layer
  2. 02The 100-Square-Foot Line for Permits and Licensing
  3. 03Class A Covering, Citywide
  4. 04Ice Barrier Depends on Elevation, Not Just Slope
  5. 05Inspection Timing Splits by Material
  6. 06Materials Cannot Be Staged Before the Permit Is Issued
  7. 07How We Sequence a Colorado Springs Reroof
  8. 08Roofing Near Colorado Springs
  9. 09Roofing in Other Front Range Cities
  10. 10Other Apollo Services in Colorado Springs
  11. 11Related Pages
  12. 12Common Questions
  13. 13Talk to Us About Your Project

Roofing in Colorado Springs goes through the Pikes Peak Regional Building Department, not a city roofing office, and PPRBD’s reroof guidelines set several rules that shape the job before a single shingle comes off. Our crew reads a Colorado Springs roof against those rules first: the tear-off requirement, the elevation-based ice barrier line, the covering class the City requires, and the inspection points that apply to the material being installed. That sequence keeps the schedule realistic instead of guessing at what an inspector will ask for.

Full Tear-Off, Not a Second Layer

PPRBD’s guidance is direct on this point: new asphalt roof coverings may not go on over existing layers on a residential home. All existing roof covering comes off first. That single rule removes the option some homeowners expect — layering a new roof over an old one to save a day of labor — and it changes how we price and schedule the job, because deck condition only becomes visible once the old roof is gone.

Once the deck is exposed, our crew inspects it before ordering underlayment. A tear-off is also when hidden problems — soft sheathing, old skip sheathing, prior water damage — get found, and PPRBD’s own guidance on plank decking (skip sheathing) sets a real threshold for that: gaps have to be a quarter inch or less, or the deck needs re-decking or an overlay layer before covering goes on.

The 100-Square-Foot Line for Permits and Licensing

Any reroof repair or replacement over 100 square feet needs a permit, and PPRBD treats performing that work without a license as a Code violation unless the person doing it owns the home and lives in it as their primary residence. That threshold is why we do not treat a small patch and a full reroof as the same conversation: scope decides both the permit path and who is allowed to do the work.

We confirm the square footage before quoting, because a repair that creeps past 100 square feet mid-project changes the permit status of the job, not just the price.

Class A Covering, Citywide

Colorado Springs requires a minimum Class A roof covering on one- and two-family dwellings, excluding solid wood roofing products; accessory structures need at least Class B. That is a citywide baseline, not a neighborhood-specific rule, so it applies whether the home sits near open space or well inside a subdivision. We select material against that minimum before presenting options, along with the drip edge requirement PPRBD calls out at eaves and rakes of shingle roofs.

Asphalt shingles also carry a minimum slope: PPRBD does not allow them below a 2:12 pitch. On a lower-slope section of roof, that pushes the material choice toward a different covering rather than asphalt, and we flag that during the site visit rather than after ordering.

Ice Barrier Depends on Elevation, Not Just Slope

Colorado Springs sits across a real elevation range, and PPRBD ties the ice barrier requirement to that fact directly: the property’s elevation is printed on the permit receipt, and properties above 7,000 feet require an ice barrier. Where it applies, the barrier has to be at least two layers of underlayment cemented together, or a self-adhering polymer-modified bitumen sheet, extending from the eave’s edge to at least 24 inches inside the exterior wall line.

That means two homes a few miles apart, one below the line and one above it, can have different underlayment requirements on the same style of roof. We check the elevation on the permit record before finalizing the underlayment plan rather than assuming a citywide default either way.

Inspection Timing Splits by Material

Typical asphalt roofing and direct-to-deck metal shingles on a residential home do not require a mid-roof inspection under PPRBD’s current guidance. Tile roofs are different: they need a roof dry-in inspection after all underlayment, battens, and flashing are installed and before any tile is stocked or installed on the roof. Missing that window means the assembly PPRBD needs to see gets covered before it can be reviewed.

We build tile jobs around that inspection point specifically, keeping the dry-in stage open for the inspector rather than staging tile early to save time. On an asphalt or direct-to-deck metal job, the schedule is more continuous since no mid-roof stop is required, though the final inspection still closes out the permit either way.

Materials Cannot Be Staged Before the Permit Is Issued

PPRBD treats stocking roofing materials on the driveway or roof as the start of the project. Staging materials ahead of permit issuance is not allowed, and doing so can bring a tripled permit fee and a stop-work order. That is a scheduling constraint as much as a compliance one: a delivery truck cannot show up the day before the permit is expected just to save a day.

We sequence material delivery to land after the permit is in hand, which sometimes means holding a delivery date even when the crew and the weather window are both ready.

How We Sequence a Colorado Springs Reroof

The job starts with scope confirmation against the 100-square-foot threshold, elevation lookup for the ice barrier rule, and permit filing before any material is delivered or staged. Tear-off follows once the permit is issued, exposing the deck for inspection and any plank-decking gaps to be addressed. Underlayment goes down according to the elevation-based ice barrier requirement and the manufacturer’s instructions, then flashing and drip edge details are set before covering begins.

For tile roofs, the dry-in inspection is scheduled before tile is stocked or installed; for standard asphalt and direct-to-deck metal, that stop is not required. The final inspection closes the permit once the covering is complete. Our crew keeps the roof at each stage PPRBD needs to see, rather than moving fast and hoping the record catches up.

Roofing Near Colorado Springs

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Roofing in Other Front Range Cities

Apollo handles roofing across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Colorado Springs

These Colorado Springs guides cover the other projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Colorado Springs.

Common Questions

Can a new roof go over the old one in Colorado Springs?
No. PPRBD requires full removal of existing roof coverings before a new asphalt covering is installed on a residential home.

Does every reroof in Colorado Springs need a permit?
Any reroof repair or replacement over 100 square feet needs a permit, and performing that work without a license is a Code violation unless the person owns and lives in the home.

Do I need an ice barrier on my roof?
It depends on elevation. Properties above 7,000 feet require an ice barrier meeting PPRBD’s underlayment specification; the elevation is listed on the permit receipt.

What roof covering class does Colorado Springs require?
A minimum Class A covering on one- and two-family dwellings (excluding solid wood products), and at least Class B on accessory structures.