Kitchen Remodeling

Kitchen Remodeling in Commerce City, CO

Kitchen remodeling in Commerce City, CO planned around city permit triggers, RALT permits, the 2023 electrical code, plan review times and licensed trades.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
Kitchen remodel with white upper cabinets, a navy island with white counter stools and a stainless range hood
Kitchen remodel with white upper cabinets, a navy island with white counter stools and a stainless range hood — illustrative reference image, not a project photo.
On this page12 sections
  1. 01Where Commerce City Draws the Permit Line in a Kitchen
  2. 02How the Permit Is Filed in eTRAKiT
  3. 03Electrical and Gas Work Under the Adopted Codes
  4. 04Walls, Windows, and When Drawings Need a Seal
  5. 05Condos, Review Times, and Valuation
  6. 06How We Sequence a Commerce City Kitchen Remodel
  7. 07Kitchen Remodeling Near Commerce City
  8. 08Kitchen Remodeling in Other Front Range Cities
  9. 09Other Apollo Services in Commerce City
  10. 10Related Pages
  11. 11Common Questions
  12. 12Talk to Us About Your Project

Kitchen remodeling in Commerce City is permitted and inspected by the city’s Building Safety Division, which works out of the Civic Center at 7190 Colorado Boulevard, Suite 600. Applications are filed online through eTRAKiT, and the city publishes a plain list of what needs a permit and what does not. Our crew plans each Commerce City kitchen against that list and the codes the city has adopted, so the design, the paperwork, and the inspections all point the same way from the start.

Where Commerce City Draws the Permit Line in a Kitchen

The city’s permit guide names kitchen cabinets as work that does not need a permit. The same exempt list includes new floor finishes, replacement of interior finishes, non-structural cosmetic repairs, and window or door replacements with no structural alterations. A kitchen that keeps its layout and only gets new boxes, new doors, fresh paint, and a new floor usually stays on the exempt side.

The other side of the line is short but important. Commerce City requires a permit for interior alterations, new plumbing fixtures, new electric appliances, and new or replacement gas appliances. Moving the sink to an island, adding a pot filler, installing a new gas range, or hardwiring a new appliance circuit all move the project into permit territory.

The city also makes a point worth repeating: being exempt from a permit does not exempt the work from the building code. Even a cabinet-only refresh still has to meet code, so we treat both kinds of kitchen with the same care and simply change how much paperwork goes to the city.

How the Permit Is Filed in eTRAKiT

Commerce City sorts residential work into permit types. Interior remodels fall under the Residential Alteration (RALT) permit, the same type the city uses for basement finishes, truss repairs, and foundation repairs. Separate residential electrical, plumbing and gas, and mechanical and gas permit types exist for trade-only work.

The city’s process runs in ten steps: decide whether a permit is needed, prepare documents, apply in eTRAKiT, pay upfront fees, then pass Gateway Review, Plan Review, and Pre-Issuance Review before the permit is issued. Paper and emailed applications are not part of that process. Contractors apply using the account tied to their license number, and the city warns that a lapsed or invalid license will delay issuance.

That is why we line up every trade’s licensing before the kitchen application goes in. Commerce City lists separate license classes for residential builders, electricians, plumbers, and mechanical contractors, and each one must be current on its own.

Electrical and Gas Work Under the Adopted Codes

Commerce City enforces the 2023 National Electrical Code for permits applied for after August 1, 2023. The city’s electrical page lists three required electrical inspections: underground, rough-in, and final. Most kitchen remodels never trench, so rough-in and final are the two that shape the schedule.

The city does not publish a kitchen-specific wiring guide, and it lists no local kitchen amendments on its electrical code page. Countertop receptacle spacing, small-appliance circuits, and GFCI coverage therefore follow the adopted 2023 code as written. We design island and perimeter circuits to that edition and confirm any question with the Building Safety Division before the walls close.

Gas work has its own trigger. The permit guide says new and replacement gas appliances need a permit, so trading an electric range for a gas one, or swapping an old gas cooktop, is permitted work. One local amendment to note: the city prohibits unvented alcohol fuel-burning decorative appliances in occupied interior spaces.

Walls, Windows, and When Drawings Need a Seal

Opening a kitchen to a dining or living room is where planning matters most. Commerce City requires construction documents to be sealed by a Colorado-registered architect or professional engineer, with an exception for one- and two-family homes designed under the International Residential Code. The building official can still require sealed documents on a given project.

The city does not publish a separate rule on removing load-bearing walls, so we do not assume a standard answer. When a wall carries floor or roof loads, we bring in an engineer for the beam and support design and let the stamped details travel with the application. That keeps the plan review focused and avoids a correction round later.

Windows follow the same pattern. A replacement window with no structural alteration is exempt, but cutting a wider opening over the sink changes the header and moves the work back into permit scope.

Condos, Review Times, and Valuation

Commerce City treats apartments and condominiums as commercial projects, and the city says this includes remodels of existing condo units. A condo kitchen therefore does not follow the single-family RALT path, and we plan it through the commercial side from day one.

For single-family homes, the city’s published timeframes say initial residential reviews are completed within 14 days of the completeness review, which usually happens on the day of submittal. Follow-up reviews after comments get another 7 days, counted from the day the response is received. Revisions follow the same timeframes.

Permit fees are based on the complete project valuation, and use tax is collected on the value of building materials. Plan review fees are paid when the application is filed, and the rest is due before the permit is issued. The city’s fee page does not list specific amounts, so we confirm the current figures with the office when the application is ready.

How We Sequence a Commerce City Kitchen Remodel

We start by walking the kitchen and sorting every item on the wish list into exempt or permit work, using the city’s own list. If only cabinets, finishes, and flooring change, we schedule the build. If plumbing, gas, circuits, or walls change, we prepare RALT drawings, add engineering where a wall carries load, and confirm each trade’s license is current before filing in eTRAKiT.

Once the permit is issued, demolition and rough work follow, then rough-in inspections, which we schedule through eTRAKiT by 4 p.m. on the business day before. The permit card stays on site for the life of the job, and construction noise stays inside the city’s 7 a.m. to 8 p.m. hours. After drywall, cabinets, counters, and fixtures go in, and the final inspections close out the kitchen.

Kitchen Remodeling Near Commerce City

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Kitchen Remodeling in Other Front Range Cities

Apollo handles kitchen remodeling across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Commerce City

These Commerce City guides cover the other major remodeling projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Commerce City.

Common Questions

Do I need a permit to replace kitchen cabinets in Commerce City?
No. Commerce City lists kitchen cabinets, floor finishes, and replacement of interior finishes as exempt. New plumbing fixtures, new electric appliances, and new or replacement gas appliances do need a permit, and exempt work still has to meet the building code.

How long does kitchen plan review take in Commerce City?
The city’s published timeframes say initial residential reviews are completed within 14 days of the completeness review, and follow-up reviews get 7 days from the date comments are answered. Confirm current timing with the Building Safety Division.

Which electrical code applies to my kitchen?
Commerce City adopted the 2023 National Electrical Code for permits applied for after August 1, 2023. Required electrical inspections are underground, rough-in, and final.

Is a condo kitchen remodel handled differently?
Yes. The city treats remodels of existing condo units as commercial projects, so they follow the commercial permit path rather than the single-family residential alteration permit.

Talk to Us About Your Project

Tell us what you want to change in your kitchen, including the layout, the sink location, gas appliances, lighting, and any walls you want to open. We sort the work against Commerce City’s permit list, coordinate engineering and licensed trades, and schedule the rough and final inspections through eTRAKiT.