Kitchen Remodeling

Kitchen Remodeling in Colorado Springs, CO

Kitchen remodeling in Colorado Springs planned around PPRBD per-trade permits, the 2021 IRC and 2023 NEC, zoning review for second kitchens, inspections.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
Remodeled kitchen in a Colorado Springs, Colorado home
Remodeled kitchen in a Colorado Springs, Colorado home — illustrative reference image, not a project photo.
On this page13 sections
  1. 01Where the Permit Line Falls in a Colorado Springs Kitchen
  2. 02Per-Trade Permits Under One Number
  3. 03What PPRBD Wants to See in the Plans
  4. 04Adopted Codes Behind the Inspections
  5. 05Second Kitchens Need Zoning Approval First
  6. 06Historic Homes in the Old North End
  7. 07How We Sequence a Colorado Springs Kitchen Remodel
  8. 08Kitchen Remodeling Near Colorado Springs
  9. 09Kitchen Remodeling in Other Front Range Cities
  10. 10Other Apollo Services in Colorado Springs
  11. 11Related Pages
  12. 12Common Questions
  13. 13Talk to Us About Your Project

Kitchen remodeling in Colorado Springs runs through the Pikes Peak Regional Building Department, not a city building office. PPRBD issues permits by trade, reviews structural changes on paper, and checks electrical and plumbing work in the field. Our crew plans each Colorado Springs kitchen around that split so the drawings, the trade permits, and the inspection visits all describe the same project.

Where the Permit Line Falls in a Colorado Springs Kitchen

PPRBD draws a clear line between cosmetic work and permitted work. Its homeowner guidance lists replacing kitchen cabinets and most appliances, installing new flooring, interior painting, and minor plumbing and heating repairs as cosmetic improvements that do not need a permit. A kitchen refresh that stays inside that list can move straight to scheduling.

Most full remodels go further. New circuits, a relocated sink, a moved gas line, a new range hood duct, or a wall coming out all fall outside the cosmetic list. PPRBD also names electrical work, water heaters, furnaces, and similar equipment as permitted work. Once any of that is in the scope, the project needs trade permits, and if structure changes, a building permit as well.

We sort the list before anything is ordered. Cabinets and counters are one conversation; the circuits, drain lines, and framing behind them are another. Keeping the two separate early is what keeps a Colorado Springs kitchen from stalling when an inspector asks about work that was never permitted.

Per-Trade Permits Under One Number

PPRBD issues permits on a per-trade basis. Building, electrical, mechanical, and plumbing permits are attached together under a single permit number, and when a building permit is required it has to be obtained first. That order matters in a kitchen, because the trade permits hang off the building permit rather than standing alone.

PPRBD requires that any permit for work performed by a licensed contractor be obtained by that contractor. It also requires contractors doing permitted work to be licensed and registered with the department, and Colorado state-licensed electrical and plumbing contractors must register with PPRBD as well. On a kitchen, that means each trade on the job needs to line up with the permit that covers its work.

We map every trade to its permit before the first cabinet comes off the wall. The electrician, plumber, and HVAC installer each know which inspections belong to them, and nobody is waiting on a permit that was never attached.

What PPRBD Wants to See in the Plans

PPRBD’s residential remodel handout asks for three views of the kitchen level: the existing floor plan, a demo plan showing what is being removed, and the proposed floor plan. Those can be combined on one sheet if they stay legible. The plan also shows room dimensions, the intended use of each space, window sizes and types, tempered safety glass where required, mechanical equipment locations, and smoke and carbon monoxide detector locations.

One detail surprises people: PPRBD tells applicants not to include electrical or plumbing one-lines or schematics, because residential plan review does not cover those trades. Electrical and plumbing code compliance is checked in the field during inspections. That puts more weight on how the rough work is actually installed.

When a wall is coming out to open the kitchen, PPRBD requires a framing plan showing framing material, spacing, post, beam, and header sizes, the number of trim and king studs at headers, bearing walls, and hangers and tie-downs. Steel-to-steel connections need details and may need the seal of a Colorado-licensed design professional. We bring that framing information into the plans instead of treating the wall as a field decision.

Adopted Codes Behind the Inspections

Colorado Springs builds under the 2023 Pikes Peak Regional Building Code. The City approved it on March 30, 2023 and it took effect June 30, 2023; the current 2nd Printing has been in effect since June 30, 2026. It adopts the 2021 International Residential Code, the 2021 IECC with Colorado’s Model Electric Ready and Solar Ready Code, and the 2023 National Electrical Code.

PPRBD’s own reference sheets note that AFCI protection is required under the NEC in a list of rooms that includes kitchens, covering devices, lights, and receptacles, and direct readers to the currently adopted NEC for exact locations. Because electrical plans are not reviewed up front, the circuit layout has to be right when the electrical rough inspection arrives.

We build kitchens to the adopted editions, not to what a previous kitchen in the same house was built to. The inspector is reading the current code, so the rough-in has to meet it.

Second Kitchens Need Zoning Approval First

Homeowners sometimes want a second kitchen in a basement or lower-level suite. PPRBD states that adding a second kitchen or kitchenette with a permanent 220v or gas cooktop, stove, or range requires approval through the Zoning Authority. Depending on the property location and zoning, a second kitchen may be prohibited or may need additional modifications.

That approval sits with City of Colorado Springs zoning, separate from the PPRBD building review. We flag a second cooking appliance at the start so the zoning question gets answered before cabinets, gas, or a dedicated circuit are designed around it.

Historic Homes in the Old North End

Many kitchen remodels are entirely interior, but some change a window, add an exterior vent, or push out a wall. For homes inside the City’s Historic Preservation Overlay, modifications to an existing structure require review. In the North End, requests are evaluated against the Old North End Historic District Design Standards and the Old North End Interpretive Guide approved in 2016.

We confirm overlay status before designing any exterior change tied to a kitchen. A range hood vent or a resized window is a small detail in the kitchen plan but can be the item that triggers historic review.

How We Sequence a Colorado Springs Kitchen Remodel

We start by separating cosmetic work from permitted work, then check for a second kitchen, a structural wall, or an exterior change that brings zoning or historic review into the project. Drawings follow PPRBD’s remodel handout: existing, demo, and proposed plans, a framing plan where needed, and detector locations. The building permit is issued first, with the trade permits attached under the same number.

In the field, our crew protects the rest of the house, completes demolition, and builds the framing changes. Rough electrical, plumbing, and mechanical go in and are inspected while walls are open, since those trades are verified on site rather than on paper. After insulation and drywall come cabinets, counters, fixtures, appliances, and the final inspections for each trade. In Colorado Springs, a kitchen goes smoothly when the per-trade permit structure and the field sequence are planned as one job.

Kitchen Remodeling Near Colorado Springs

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Kitchen Remodeling in Other Front Range Cities

Apollo handles kitchen remodeling across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Colorado Springs

These Colorado Springs guides cover the other major remodeling projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Colorado Springs.

Common Questions

Does a Colorado Springs kitchen remodel need a permit?
PPRBD treats replacing cabinets and most appliances, new flooring, painting, and minor plumbing repairs as cosmetic work that does not need a permit. New circuits, relocated plumbing or gas, mechanical changes, and structural work need permits.

Who issues kitchen permits in Colorado Springs?
The Pikes Peak Regional Building Department issues building permits for the City of Colorado Springs. Permits are issued per trade and attached under one permit number, with the building permit obtained first when one is required.

Can I add a second kitchen in my Colorado Springs home?
PPRBD requires Zoning Authority approval for a second kitchen or kitchenette with a permanent 220v or gas cooktop, stove, or range. Depending on location and zoning, it may be prohibited or need modifications.

Which codes apply to a Colorado Springs kitchen?
The 2023 Pikes Peak Regional Building Code, which adopts the 2021 IRC, the 2021 IECC with Colorado’s Electric Ready and Solar Ready Code, and the 2023 NEC.

Talk to Us About Your Project

Tell us what is changing in your kitchen: walls, sink location, gas, circuits, ventilation, or a second cooking area. We handle the permit process through PPRBD and coordinate the drawings, trade scope, inspections, and closeout for Colorado Springs kitchen remodels.