Framing

Framing in Georgetown, CO

Structural framing for additions and remodels in Georgetown, CO. Apollo Construction follows the Town's own addition guide and SAFEbuilt review process.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
New wood framing for a rear addition on a historic Victorian house in Georgetown, Colorado
New wood framing for a rear addition on a historic Victorian house in Georgetown, Colorado — illustrative reference image, not a project photo.
On this page12 sections
  1. 01Structural Framing Goes Through Town Hall and SAFEbuilt Review
  2. 02Roof Tie-Ins Have Specific Blocking and Flashing Requirements
  3. 03Foundation Framing Details Are Spelled Out for Additions
  4. 04Historic Review Applies Before Framing Changes the Exterior
  5. 05Load Values and Code Edition Are Confirmed Project by Project
  6. 06How We Sequence a Georgetown Framing Project
  7. 07Framing Near Georgetown
  8. 08Framing in Other Front Range Cities
  9. 09Other Apollo Services in Georgetown
  10. 10Related Pages
  11. 11Common Questions
  12. 12Talk to Us About Your Project

Framing in Georgetown carries the weight of a mountain climate and a historic streetscape at the same time. The wood or engineered structure has to work under real snow and wind exposure at altitude, and the finished form of an addition or structural change still has to pass through the Town of Georgetown’s building-permit review before it is buildable. Apollo Construction treats the framing package as the part of the project where those two demands meet.

This page is a planning guide based on the Town’s own published guidance for additions to single-family dwellings. It does not replace the issued permit, SAFEbuilt’s plan review, or an engineer’s stamped design where one is required.

Structural Framing Goes Through Town Hall and SAFEbuilt Review

Framing changes tied to an addition or a remodel are submitted through the Town of Georgetown’s standard building-permit application, using the Addition or Remodel/Finish categories, and reviewed by SAFEbuilt under contract to the Town. We confirm the scope classification with Town Hall before finalizing framing drawings so the submittal matches how the Town will actually review it.

The Town’s own guide for additions to single-family dwellings calls for a site plan, a floor plan showing both existing and new dimensions and openings, construction details including foundation details and exterior elevations, and an Energy Code Compliance Report. We assemble that package before we frame anything, not after.

Roof Tie-Ins Have Specific Blocking and Flashing Requirements

The Town’s addition guide requires solid 2x blocking between rafters or trusses and at roof tie-downs, and requires roof flashing where a new roof section ties into the existing roof. These are not optional finishing touches — they are part of what SAFEbuilt checks when a framed addition meets the original structure, and we build them into the rough framing stage rather than treating them as a punch-list item.

The same guide notes that attic ventilation and access may be required and that heat must be supplied to all habitable rooms, which shapes how we frame chases, soffits, and access openings before insulation and drywall close the assembly.

Foundation Framing Details Are Spelled Out for Additions

For a crawl space foundation, the Town’s guide specifies #4 rebar continuous top and bottom with an 18-inch minimum splice, 1/2-inch-diameter steel anchor bolts at 6′-0″ on center maximum with a 7-inch minimum penetration, and at least 18 inches of clear space between the bottom of the floor joist and grade. Framing crews use these figures as the baseline for sill and mudsill layout on additions, adjusted to the specific approved design.

Where an addition sits over a basement, the Town’s guide states an engineer-designed foundation is required. We do not frame a basement-level addition on an assumed foundation design; we wait for the stamped engineering before floor and wall framing begins on that portion of the structure.

Historic Review Applies Before Framing Changes the Exterior

Georgetown’s Design Review Commission reviews additions and exterior remodeling, and its guidance states that applies “regardless of where they are located in Georgetown.” Any framing scope that changes the building’s exterior form, roofline, or footprint needs a Certificate of Appropriateness resolved before the building permit is issued, which we confirm with the DRC during design rather than after framing lumber is on site.

Interior framing changes that do not alter the exterior are generally a Town Hall/SAFEbuilt matter rather than a DRC matter, but we confirm that distinction case by case rather than assuming it for every scope.

Load Values and Code Edition Are Confirmed Project by Project

NOT FOUND: a published Georgetown-specific ground snow load or design wind speed was not available from an accessible official source, and the exact IRC/IBC edition currently enforced by the Town could not be confirmed from an accessible document. We do not assume a code year or a design load figure; we confirm both with SAFEbuilt or the Town’s building department before finalizing structural framing drawings.

That confirmation step happens early, at the design stage, so it does not become a delay once material is ordered and a crew is scheduled.

How We Sequence a Georgetown Framing Project

We start with the site plan, floor plan, and Energy Code Compliance Report package the Town’s addition guide describes, and confirm with SAFEbuilt whether engineered foundation design is required for the specific footprint. Where the scope changes the exterior, we resolve Design Review Commission review before submitting for the building permit, since the Certificate of Appropriateness is expected before permit issuance.

Framing itself follows the approved plans: foundation and anchor-bolt layout first, then wall and floor framing, then roof framing with the blocking and flashing details the Town’s guide specifies at tie-in points. We hold for inspection at each required stage before covering framed work with sheathing, insulation, or drywall, coordinating inspection requests with SAFEbuilt at least 24 hours ahead as the Town’s process requires.

Framing Near Georgetown

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Framing in Other Front Range Cities

Apollo handles framing across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Georgetown

These Georgetown guides cover the other projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Georgetown.

Common Questions

What does Georgetown require before framing an addition?
The Town’s guide for additions to single-family dwellings calls for a site plan, a floor plan showing existing and new dimensions, construction details including foundation details and exterior elevations, and an Energy Code Compliance Report, all reviewed by SAFEbuilt under the Town’s building-permit process.

Does an addition over a basement need an engineer?
Yes, according to the Town’s own guide: additions built over a basement require an engineer-designed foundation. We wait for that stamped design before framing the foundation and floor system on that portion of the addition.

Are there specific rules for tying a new roof into the existing one?
The Town’s guide requires solid 2x blocking between rafters or trusses and at roof tie-downs, plus flashing where the new roof ties into the existing roof. We build those details into the framing stage rather than leaving them for finish work.

Will a framing change need historic district approval?
If it changes the exterior form, roofline, or footprint, it may need a Certificate of Appropriateness from the Design Review Commission before the building permit is issued, since DRC guidance applies regardless of where a property sits in Georgetown. Interior-only framing is a different question we confirm case by case.

Talk to Us About Your Project

Tell us the address, the framing scope, and whether the change reaches the exterior of the structure. We will identify the Town/SAFEbuilt permit package, any engineering that Georgetown’s addition guide requires, and whether Design Review Commission approval applies before we schedule framing.