Residential demolition in Louisville, CO planned around the City's permit, Colorado's asbestos inspection rule, and the 1955 historic demolition review.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
Rear lean-to with lath and plaster removed during careful demolition in a historic miner's cottage in Louisville, Colorado
Rear lean-to with lath and plaster removed during careful demolition in a historic miner's cottage in Louisville, Colorado — illustrative reference image, not a project photo.
On this page12 sections
  1. 01Louisville Requires a Demolition Permit for Residential and Commercial Work
  2. 02Asbestos Comes Before Demolition, Not After
  3. 03The Marshall Fire Program’s Own Asbestos-Permit Sequence
  4. 04When a Building Triggers Historic Demolition Review
  5. 05Right-of-Way Permits and What Louisville Hasn’t Published
  6. 06How We Sequence a Louisville Demolition Project
  7. 07Demolition Near Louisville
  8. 08Demolition in Other Front Range Cities
  9. 09Other Apollo Services in Louisville
  10. 10Related Pages
  11. 11Common Questions
  12. 12Talk to Us About Your Project

Demolition in Louisville is never just “take it down and haul it away.” Before Apollo Construction opens a wall, pulls a kitchen, or removes a structure, we work through three separate questions the City and the State of Colorado both expect answered: does this need a City demolition permit, has the material been checked for asbestos, and is the building old enough to trigger a historic-demolition review. Getting the order right protects the schedule as much as it protects the crew.

Louisville Requires a Demolition Permit for Residential and Commercial Work

The City’s permit-requirements table lists both “Demolition – Residential” and “Demolition – Commercial” as work that needs a permit. Demolition is also grouped among the City’s fast-tracked permit types, with a typical review time of 1 to 2 weeks, similar to the timeline the City gives for interior remodels.

A published fee amount for a standard residential demolition permit was not on the general permit-requirements or fee pages we reviewed, so we confirm the current fee with Building Safety as part of scoping rather than quoting a number that may be out of date.

Asbestos Comes Before Demolition, Not After

Colorado’s asbestos rule, enforced by the Colorado Department of Public Health and Environment, applies statewide and does not depend on the age or size of the building: before any renovation or demolition activity that could disturb suspect material, a Colorado-certified Asbestos Building Inspector has to inspect it, or the material has to be treated as if it is asbestos-containing and handled that way. Regulated asbestos work carries its own required notification period before the material can be disturbed.

We schedule that inspection early in preconstruction, before a demolition date is fixed, because the inspection result and its notification window drive the schedule — not the other way around.

The Marshall Fire Program’s Own Asbestos-Permit Sequence

Louisville’s published guidance for Marshall Fire rebuild work describes a specific sequence for interior-only demolition tied to that program: a state asbestos permit is required before the City demolition permit application, and it has to be submitted along with it. That guidance also notes no City fee for the “Minor Permit: Demolition” type used in that program.

That sequence is written for fire-damaged property inside the City’s rebuild program. Whether the same asbestos-permit-before-application order applies to an ordinary residential demolition outside that program was not stated on the general permit pages we reviewed, so we confirm the applicable sequence with Building Safety for any project that is not part of the Marshall Fire rebuild.

When a Building Triggers Historic Demolition Review

A structure built in or before 1955 can trigger a demolition review if the work removes more than 50% of the structure, more than 50% of the roof, or alters a street-facing elevation. The process starts with an initial consultation with Planning staff, then an application that includes a narrative letter, a cost estimate, and a condition assessment.

Some projects qualify for a streamlined administrative review — for example, where the roof, windows, or doors were already replaced after 1955, or where the change is limited to signage. Otherwise the application goes to a Historic Preservation Commission subcommittee, which decides whether the property could qualify for landmark designation, and then to a full HPC public hearing. The HPC can release the application or place a stay of up to 180 days from the date of application, during which the applicant can work with staff or an HPC member on design alternatives.

Right-of-Way Permits and What Louisville Hasn’t Published

If a dumpster, container, or staging equipment for a demolition project sits in the street or right-of-way, that needs its own right-of-way permit from Public Works, separate from the demolition permit itself. We flag that early on any job with a small lot or no on-site staging area.

A published, demolition-specific rule for capping or disconnecting gas, electric, or water service before work begins was not on the pages we reviewed, and neither was a citywide construction-and-demolition debris diversion requirement. We coordinate utility disconnects with the applicable utility and confirm any current City expectation with Building Safety rather than assuming a rule that isn’t published.

How We Sequence a Louisville Demolition Project

We start with a site walk that identifies the intended removal, what must be protected, and the building’s approximate age, since that age determines whether historic review even applies. If the structure was built in or before 1955 and the scope is significant, we raise the historic-review question with Planning before committing to a start date.

Next comes the asbestos inspection, scheduled early enough that its result and any required notification period are built into the plan rather than discovered mid-project. In parallel, we prepare the City demolition permit application, request a right-of-way permit if a dumpster or equipment needs street space, and confirm utility disconnect requirements with each utility provider.

Once permits, the asbestos clearance, and utility disconnects are in place, demolition proceeds in a controlled sequence: protect what stays, remove systems and finishes in a planned order, and keep the site safe for the next trade. We photograph the exposed condition before closeout so the record supports whatever design or rebuild decision comes next.

Demolition Near Louisville

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Demolition in Other Front Range Cities

Apollo handles demolition across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Louisville

These Louisville guides cover the other projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Louisville.

Common Questions

Does residential demolition in Louisville need a permit?
Yes. The City’s permit-requirements table lists both residential and commercial demolition as work that needs a permit, and demolition is grouped among the fast-tracked permit types with a typical 1 to 2 week review.

Do I need an asbestos inspection before demolition in Louisville?
Colorado’s statewide asbestos rule, enforced by CDPHE, requires a Colorado-certified Asbestos Building Inspector to inspect suspect material before any renovation or demolition activity that could disturb it, or the material must be treated as asbestos-containing and handled accordingly. This applies regardless of the building’s age or size, and regulated asbestos work carries its own required notification period.

Which older buildings trigger a historic demolition review in Louisville?
A structure built in or before 1955 can trigger review if the work removes more than 50% of the structure or roof, or alters a street-facing elevation. The process can include a Historic Preservation Commission subcommittee and a public hearing, and the HPC can place a stay of up to 180 days on the application.

Can a dumpster for a demolition project sit in the street?
Only with a separate right-of-way permit from Public Works. That permit is distinct from the City’s demolition permit, so we check lot size and staging space early on any project where street space might be needed.

Talk to Us About Your Project

Tell Apollo Construction about your demolition project in Louisville, and we will map it against the City’s current permit, checklist, and inspection requirements before you commit to materials or a schedule. We will give you a clear scope, the permits it likely needs, and a realistic sequence. Send us a message to start.