Demolition

Demolition in Colorado Springs, CO

Demolition in Colorado Springs planned around PPRBD wrecking and interior permits, CDPHE's asbestos inspection rule, utility cutoffs, and agency sign-off.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
Kitchen during selective demolition with cabinets removed, studs exposed, bagged debris and a plastic dust barrier
Kitchen during selective demolition with cabinets removed, studs exposed, bagged debris and a plastic dust barrier — illustrative reference image, not a project photo.
On this page12 sections
  1. 01Whole-Structure Removal Needs a Wrecking Permit
  2. 02Interior Selective Demolition Still Needs Its Own Review
  3. 03Asbestos Inspection Applies to Every Demolition
  4. 04Utility Disconnects and Outside-Agency Sign-Off
  5. 05What We Still Confirm Before Demolition Begins
  6. 06How We Sequence a Colorado Springs Demolition Project
  7. 07Demolition Near Colorado Springs
  8. 08Demolition in Other Front Range Cities
  9. 09Other Apollo Services in Colorado Springs
  10. 10Related Pages
  11. 11Common Questions
  12. 12Talk to Us About Your Project

Demolition in Colorado Springs splits into two permit tracks before a single wall comes down. Removing an entire structure needs a wrecking permit from the Pikes Peak Regional Building Department; selective interior demolition is treated differently and may need its own interior non-load-bearing demolition permit. Layered on top of either path is a state asbestos requirement that applies regardless of the building’s age. Apollo Construction sorts a Colorado Springs demolition into these tracks before scheduling any removal.

Whole-Structure Removal Needs a Wrecking Permit

PPRBD’s wrecking-permit sheet is direct about when this permit applies: it is required “when an entire structure is being removed.” The same sheet notes that interior demolition is different and may require an interior non-load-bearing demolition permit instead, which is the path most kitchen, bathroom, and basement gut-outs follow rather than a full wrecking permit.

To obtain a wrecking permit, PPRBD requires a licensed wrecking contractor’s ID number, insurance documentation that includes XCU coverage for explosion, collapse, and underground risk, proof of utility cutoff for gas and electric from the applicable utility purveyor, and a permit from the Colorado Department of Public Health and Environment covering asbestos and debris removal. We confirm which category a project falls into — whole-structure or interior — before quoting the removal, since the paperwork and the contractor requirements differ.

Interior Selective Demolition Still Needs Its Own Review

Removing or modifying an interior wall, whether or not it carries load, is treated by PPRBD as part of an interior remodel that requires plans submitted for review before the permit is issued. That review is where a framing plan comes in if a bearing wall is involved, described in more detail on our framing page for Colorado Springs. A demolition scope that opens into structural work does not stay a demolition-only permit once a bearing element is affected.

We also check whether the project could trigger a Grading and Erosion Control permit from the City of Colorado Springs Stormwater Enterprise. That permit applies within city limits when a project disturbs one acre or more (including multiple parcels on the same common plan of development), disturbs a mapped Streamside overlay zone, or affects an open drainage channel as determined by the review engineer. Most residential interior demolition never approaches that threshold, but a teardown involving significant site disturbance is checked against it before work starts.

Asbestos Inspection Applies to Every Demolition

Colorado Regulation No. 8, Part B, administered by CDPHE, requires a Colorado-certified Asbestos Building Inspector to inspect suspect material before a renovation or demolition activity that could disturb it, or the material must be assumed asbestos-containing and handled as such. A Demolition Notification Application must be filed with CDPHE for the project — even when no asbestos is found — along with the applicable fee, and regulated demolition work carries a ten-working-day notification period before demolition may begin.

The homeowner exception that lets an owner-occupant skip a certified General Abatement Contractor for abatement work on their own primary residence does not apply to demolition. State guidance is explicit that an asbestos inspection is required for all demolition projects regardless of the building’s age, so we do not treat a newer home as exempt from that inspection step.

Utility Disconnects and Outside-Agency Sign-Off

Before a wrecking permit is issued, proof of gas and electric utility cutoff from the utility purveyor is required. We also request a utility locate through Colorado 811 ahead of any excavation-adjacent demolition work, separate from the formal disconnect proof required for the permit itself. As part of the demolition permit process, outside agencies — including the El Paso County Health Department, City of Colorado Springs Storm Water, and Colorado Springs Utilities — are notified once a permit issues, and closing out the final building inspection depends on the permit holder obtaining the applicable health department and stormwater acceptance. We treat that agency coordination as part of the schedule rather than an afterthought at the end of the job.

What We Still Confirm Before Demolition Begins

Some details in this area were not verifiable on an official page during our research and are worth naming rather than guessing at: current CDPHE asbestos trigger levels for when disturbed material must go to a certified abatement contractor, and the exact outside-agency notification workflow beyond what the wrecking-permit sheet describes. We confirm both directly with CDPHE and PPRBD before a demolition schedule is finalized, especially on older Colorado Springs homes where suspect materials are more likely.

We also confirm Historic Preservation Overlay status for the address before any exterior or structural demolition, since modifications or demolition within that overlay require City review, and we do not assume a property is outside the overlay without checking.

How We Sequence a Colorado Springs Demolition Project

We start by classifying the scope: whole-structure wrecking permit or interior demolition permit, and whether the interior scope touches a bearing wall. Utility cutoff proof, the CDPHE asbestos inspection, and any Grading and Erosion Control review are lined up before a permit application goes in, since CDPHE’s notification period alone can take ten working days once regulated material is confirmed.

In the field, we protect areas outside the scope, disconnect and cap identified utilities, and remove material in a controlled sequence rather than an open teardown, watching for suspect material the whole way even after a clean inspection report. Once removal is complete, we coordinate the required health department and stormwater sign-offs before calling for final inspection, and we document the exposed condition for whatever construction phase follows so the next trade is not guessing at what remains.

Demolition Near Colorado Springs

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Demolition in Other Front Range Cities

Apollo handles demolition across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Colorado Springs

These Colorado Springs guides cover the other projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Colorado Springs.

Common Questions

Do I need a wrecking permit for a kitchen or bathroom demolition?
Usually not. PPRBD requires a wrecking permit when an entire structure is being removed; interior demolition like a kitchen or bathroom gut-out is treated differently and may need an interior non-load-bearing demolition permit instead.

Does every Colorado Springs demolition need an asbestos inspection?
Yes. Colorado Regulation No. 8 requires a Colorado-certified Asbestos Building Inspector to inspect suspect material before demolition, or the material must be assumed asbestos-containing. This applies regardless of the building’s age, and the homeowner abatement exception does not cover demolition projects.

How long does the asbestos process add to a demolition schedule?
A Demolition Notification Application goes to CDPHE even when no asbestos is found, and regulated demolition work carries a ten-working-day notification period before demolition can begin. We build that into the schedule rather than treating it as a quick formality.

What has to happen before a wrecking permit is issued?
PPRBD requires a licensed wrecking contractor’s ID number, XCU insurance documentation, proof of gas and electric utility cutoff, and a CDPHE permit for asbestos and debris removal.

Talk to Us About Your Project

Tell us what is being removed: an interior remodel scope, a full structure, or something in between, and the age of the home. We will identify the applicable permit track, the asbestos inspection step, and any stormwater or historic-overlay review before we schedule the work.