Demolition

Demolition in Castle Pines, CO

Demolition in Castle Pines, CO planned around the City's 1-Stop permit, Class J licensing, asbestos testing thresholds, and the state's 10-day notice.

  • Licensed & insured
  • 25+ years of experience
  • Free written estimates
Kitchen stripped to the studs during interior demolition inside a newer two-story stucco and stone home on a hillside in Castle Pines, Colorado
Kitchen stripped to the studs during interior demolition inside a newer two-story stucco and stone home on a hillside in Castle Pines, Colorado — illustrative reference image, not a project photo.
On this page12 sections
  1. 01Demolition Is a 1-Stop Permit, With a Licensed Contractor Requirement
  2. 02Asbestos Testing Is Required Regardless of the Home’s Age
  3. 03A Separate State Notification Applies Even When No Asbestos Is Found
  4. 04What Castle Pines Does Not Publish for Demolition
  5. 05Right-of-Way Items That Ride Along With Demolition
  6. 06How We Sequence a Castle Pines Demolition
  7. 07Demolition Near Castle Pines
  8. 08Demolition in Other Front Range Cities
  9. 09Other Apollo Services in Castle Pines
  10. 10Related Pages
  11. 11Common Questions
  12. 12Talk to Us About Your Project

Demolition in Castle Pines is one of the few scopes the City makes genuinely fast to permit — and one of the few where a homeowner can still get caught by a requirement that has nothing to do with the city at all. Castle Pines lists demolition as a 1-Stop Permit, meaning no drawings are required to get started. But before that permit does any good, state asbestos rules and, on some projects, a separate federal-linked notification period have to be satisfied. Apollo Construction sequences every Castle Pines demolition around both tracks at once.

This page describes the process as the City and the State of Colorado publish it. It is a planning guide, not a substitute for the Building Division’s determination on a specific address or the state’s review of a specific asbestos notification.

Demolition Is a 1-Stop Permit, With a Licensed Contractor Requirement

The City’s Building Permits page lists demolition — interior or whole-structure — as a 1-Stop Permit, the fastest track the City offers, needing only the total value of the work to complete the application rather than a drawn set. That speed comes with a licensing condition: Castle Pines requires a Class J contractor license specifically for demolition and wrecking work, currently priced at $75.00 annually, and as with every other trade in the city, no permit is issued until every contractor on the job is licensed.

The 1-Stop track is genuinely quick once the paperwork is ready. The obstacle for most Castle Pines demolition projects is not the City permit itself — it is the asbestos step that has to happen before that permit does any good.

Asbestos Testing Is Required Regardless of the Home’s Age

Castle Pines’ own asbestos handout sets a clear, low bar: any project disturbing more than 32 square feet of surface material or 50 linear feet of piping in a one- or two-family home requires asbestos testing, “regardless of the home’s age.” That threshold is easy to cross in ordinary residential demolition — pulling out a kitchen ceiling, stripping flooring through a hallway, or opening several rooms of drywall for a remodel.

Testing has to be performed by a Colorado-certified asbestos inspector, and the City’s rule is direct on this point: all material to be disturbed by demolition must be inspected and tested, and state-certified asbestos contractors are the ones required to do it. If a sample comes back above 1% asbestos content, abatement must be handled by a state-certified abatement contractor before demolition proceeds. Test results and any abatement clearance letters have to be submitted with the building permit application, not filed afterward.

A Separate State Notification Applies Even When No Asbestos Is Found

Beyond the City’s own testing rule, the Colorado Department of Public Health and Environment (CDPHE), under Regulation No. 8, Part B, layers on a state notification requirement for demolition. A Demolition Notification Application Form has to be submitted to the state — even when the inspection finds no asbestos — along with a notification fee, and a 10-working-day notification period is required before demolition can begin. We treat this as a separate clock from the City’s own permit review, and we start it as early in the project timeline as the scope is known, because it can be the longest single wait in an otherwise fast demolition schedule.

Confirm the current form, fee, and exact day count directly with CDPHE before locking a demolition date; state notification procedures are administered independently of the city permit office.

What Castle Pines Does Not Publish for Demolition

We looked for a City-specific utility-disconnect procedure — a form or checklist covering water, sewer, gas, or electrical disconnection ahead of demolition — and did not find one on the Building Division’s pages. Statewide practice calls for requesting a utility locate through Colorado 811 before any excavation begins, and we do that on every project regardless of scope, but no Castle Pines-specific demolition disconnect procedure is published; we confirm the sequence with the Building Division and the relevant utility provider directly.

We also did not find a historic-preservation review process tied to demolition on any official Castle Pines page. If a property later turns out to carry some other protective designation, that would surface through the City’s own review, not through a published demolition checklist we could locate.

Right-of-Way Items That Ride Along With Demolition

Most demolition projects need a dumpster or a temporary storage pod at the curb, and Castle Pines treats street-side placement as its own Right-of-Way Permit item. The 2026 fee schedule lists $375.00 for temporary dumpster placement over an initial 90 days and $190.00 for a temporary storage pod over an initial 30 days. We fold these into the demolition schedule and budget rather than treating them as a surprise add-on discovered after the dumpster is already parked on the street.

Starting demolition, or any permitted work, before the City-issued permit is in hand carries its own penalty: a fee equal to 100% of the original building fee, on top of the permit fees that are still owed. We do not begin selective or whole-structure demolition on any Castle Pines project until the permit, the asbestos clearance, and, where it applies, the CDPHE notification window have all cleared.

How We Sequence a Castle Pines Demolition

Every project starts with a walk-through that identifies the material likely to be disturbed — drywall, flooring, ceiling texture, pipe insulation — and compares the disturbed area against the City’s 32-square-foot and 50-linear-foot thresholds. If either is crossed, a Colorado-certified inspector is scheduled before a demolition date is set, because the lab turnaround and the CDPHE notification period both run on their own clocks.

Once test results are in hand and, where applicable, the state notification window has closed, we file the City’s 1-Stop demolition permit, confirm every subcontractor’s Castle Pines license is current, arrange the dumpster or storage pod permit if the street is involved, and request a Colorado 811 locate ahead of any exterior work. Interior selective demolition proceeds room by room with protection for areas outside the scope; whole-structure work follows the sequence the City’s inspector sets at permit issuance.

Demolition Near Castle Pines

Same crew, neighbouring jurisdictions. Permit rules differ by city — pick yours.

Demolition in Other Front Range Cities

Apollo handles demolition across the Front Range. Each city page below covers that city’s own permit office, code edition and local conditions.

Other Apollo Services in Castle Pines

These Castle Pines guides cover the other projects we plan and build, with the permit path for each. For every other trade, see all Apollo services in Castle Pines.

Common Questions

Does demolition in Castle Pines need a permit?
Yes, but it is a 1-Stop Permit, which does not require drawings. The applicant needs the total value of the work to complete the application, and the contractor performing the work needs a current Castle Pines Class J demolition license.

Does a Castle Pines home need asbestos testing before demolition, even if it’s new?
Yes. The City’s asbestos rule applies to any project disturbing more than 32 square feet of surface material or 50 linear feet of piping, regardless of the home’s age, and testing must be done by a Colorado-certified inspector before the permit application is complete.

Is there a waiting period before demolition can start?
Beyond the City’s own permit process, Colorado’s asbestos regulation (CDPHE Regulation No. 8, Part B) requires a 10-working-day notification period before demolition, even when no asbestos is found. Confirm the current fee and process directly with CDPHE.

Does the dumpster for a demolition project need its own permit?
If it sits in the public right-of-way or on the street, yes. Castle Pines prices temporary dumpster placement and temporary storage pod placement as Right-of-Way Permit items, separate from the demolition permit itself.

Talk to Us About Your Project

Tell us about your demolition project in Castle Pines — the scope, the address, and what you’re trying to accomplish. We will confirm which City permits and inspections apply, coordinate licensed trades, and sequence the work around Castle Pines’ review process.